Editorial/Guest Editorial | Guest Editorial | Dr. Rajbal Singh
President, ISRMTT | Download |
Journal | Rock Supports and Geological Appraisal for Head Race Tunnel of Tala Hydroelectric Project, Bhutan | Hari Dev, Rajbal Singh C.K. Sengupta | Download |
| Investigation of Delay Time Precision in Pyrotechnic Detonators | Harsh K. Verma, N. R. Thote | Download |
| Assessment and Mitigation of Blast Induced Vibration and Overbreak in Kol Dam Hydroelectric Power Project, India – A Case Study | Harsh K. Verma, R. K. Goel V. V. R. Prasad | Download |
| Effect of Spacing and Orientation of Joints in the Rock on Stress Variation in Lined Pressure Tunnels using Finite Element Method | I. Siva Parvathi, T. V. Praveen K. Suresh Kumar | Download
|
News & Views | | | Download |
Pioneers | | | Download |
Blissful Thoughts | | | Download |